Component Prep Manual

Category:  Prep Processes > Component Prep

Description: Manual Component Prep is the process of forming component leads by hand prior to insertion in the PCB.

Major Cost Drivers -- PCBA Prep Manual

Manual Component Prep Cycle Time is a function of the number of component leads that need to be preformed by hand.

Process Time = Number of Manual Preformed Leads * Lead Preform Time

  • Number of Manual Preformed Leads = (PSO)
    • Lead Preform Time = (Machine variable)

User Inputs –- PCBA Prep Manual

PSO: Number of Manual Preformed Leads

Component Software Load

Category: Prep Processes > Component Prep

Description: The Component Software Load process loads firmware onto an individual electronic component. The default software load machine is one computer with multiple connectors to program multiple different devices through those different connector locations.

Major Cost Drivers -- PCBA Component Software Load

Component Software Load Cycle Time is the time it takes to mate sockets.

// Process Time to relabel programmed part, mate socketsa, and perform software load.

processTime =
((Label Print Time*Software Revision Label Quantity)/Batch Size) +
(Label Install Time*Software Revision Label Quantity) +
(Socket Mate Time*Components to Load Quantity) +
Software Load Time

  • Label Print Time =  (Machine Variable)
  • Label Install Time =  (Machine Variable)
  • Label Install Time =  (Machine Variable)
  • Socket Mate Time = (Machine Variable)
  • Components to Load Quantity = (PSO)
  • Software Load Time =  (Machine Variable)

User Inputs –- PCBA Component Software Load

PSO: Components to Load Quantity